Finished project
Bank level of collateral

Bytový dům Praha-Hlaváčkova 7: 1. etapa

Residential building Praha-Hlaváčkova 7: 1st stage

Yield
0.078
0.00
% p.a.
Total value
877501
 mil. CZK
Guaranteed by value
110670000
 mil. CZK
LTV
0.75
%
Maturity
23
months
Purpose
construction, business_development
Annex

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consisttetur adipiscing elite, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad mínimo veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fuat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

{"cs":{"description":"### Shrnutí\n\n🟢 **Aktuální stav výstavby:** Stavba plynule pokračuje a nachází se ve fázi dokončených zemních prací a základů, včetně retenční nádrže.\n\nV 1. nadzemním podlaží jsou provedeny svislé konstrukce přibližně z 35 %, přičemž výztuže pro svislé konstrukce jsou již kompletní. Na obvodových stěnách je provedena tepelná izolace a v základech je zhotovena izolace proti vodě.\n\nPráce budou dále pokračovat na zdění a postupné realizaci nadzemních konstrukcí.\n\n**Cílem partnera** je refinancování stávajícího závazku a financování dalšího projektu. Jedná se o výstavbu bytového domu v rámci jím vlastněného celku pozemků při ulici Vrchlického na pomezí části Košíře a Smíchova na Praze 5.\n\nNa pozemku nyní stojí starší činžovní dům, který je určen k demolici. Místo něj vyroste moderní bytový dům o 7 nadzemních podlažích. V návrzích je celkem 40 bytových jednotek v dispozicích 1+kk a 2+kk. Skladba bytových jednotek byla zvolena s ohledem na optimální využitelnost dané polohy a orientace. V přízemí nalezneme parkovací stání se zakládači pro 18 automobilů a sklepy.\n\nV okolí naleznete veškerou občanskou vybavenost. Bytový dům se nachází méně než 2 km od Obchodního centra Nový Smíchov a stanice metra Anděl. O dostatek zeleně se stará nedaleký Park Klamovka či Husovy sady.\n\n### Způsoby zajištění\n\nÚvěr v celkové výši 7. tranše 877 501 Kč je zajištěn nemovitostí v hodnotě 110 670 000 Kč (LTV 75 %). V této etapě 7. tranše vybíráme 877 501 Kč \n\n1. **Zástavní právo na nemovitosti:** Pozemek parc.č. 1182, parc.č. 1184 a parc.č. 1185 k.ú. Košíře\n2. **Zástavní právo k obchodnímu podílu:** Palatinum Energy s.r.o., IČO: 28964331\n3. **Notářský zápis** s doložkou přímé vykonatelnosti.\n\n### Financování projektu\n\nPo úspěšném profinancování projektu má partner 23 měsíců na splacení jistiny úvěru.\n\nInformace o tom, jaké má partner možnosti předčasného splacení úvěru, jsou uvedeny v části D, odrážce d) listu klíčových informací pro investory ([KIIS](https://drive.google.com/file/d/1sAZtEQCfNdUto5nGnaBpIIhStTz5ju8O/view?usp=sharing)).\n\nInformace ohledně rizikového skóre projektu najdete v ([Scoring sheet](https://drive.google.com/file/d/1lQ1eiOlZaGsbb-OlYhK8lm2HU4ijJWgG/view?usp=sharing)).\n","name":"Bytový dům Praha-Hlaváčkova 7: 1. etapa"}}

FAQs

Revenues are automatically credited to your Investown wallet each month. The payoff date depends on the date the project switches to Payout status. You can send the proceeds to a bank account or reinvest.

Investment opportunities have several layers of collateral: pledge on real estate (value always at least 20% higher than the loan, max. LTV 80%), personal liability of the director or owners, notarized registration with direct enforceability (without lengthy court proceedings) and a lien on 100% of the business share of the company implementing the project.

All projects undergo a thorough analysis: we verify the creditworthiness of the partner through CRIBIS, insolvency and enforcement registers, price estimate and construction budget, financial indicators of the company and the history of the owners. The analysis involves a risk analyst, appraiser, supervisor, trader, lawyer and key account manager. Less than 5% of projects pass through the screen.

After the launch of a new project on the platform, it is possible to invest in its full proinvestment. Investown resolves administration with the project owner on an ongoing basis. Proinvestment is followed by the Investment Processing stage (signing of hedging documentation), then Payment of proceeds. You will receive the first yield 3-30 days from the switch to this stage.

Once you have made the investment, it is waiting for the target amount to be reached. After the conclusion of the investment round, the project enters the Investment Processing phase (5-7 working days). After that, it goes to the stage of Payment of income, your deposit begins to pay interest, and after a month you will receive the first return. You will receive income every month for the duration of the investment (usually 12-36 months). After the end of the investment period, you will receive the invested deposit back into the Investown wallet.

A stage is a part of a project secured by one property. The project may have 1-5 stages that do not correspond to the gradual time development of the implementation. After investing the target amount of the stage, Investown will process it immediately and switch to Payout status within a week, without waiting for the other stages.

Investors are entitled to an additional return on the contractual penalty for each day of delay. For projects with documentation until June 17, 2025, the penalty is 0.2% of the amount owed per day. For projects from 18 June 2025, it is 0.1% per day for the first 30 days, then 0.05% per day. The fine is divided among all active investors in the project.

Didn't find what you were looking for?
All FAQs

Start Investing Today

Bytový dům Praha-Hlaváčkova 7: 1. etapa
Yield
0.078
0.00
% p.a.
Total value
877501
 mil. CZK
Guaranteed by value
110670000
 mil. CZK