Profinancovaný projekt
Bankovní úroveň zajištění

Pozemky Hradištko – 3. tranše: 1. etapa

Pozemky Hradištko – 3rd tranche: 1st stage

Výnos
0.086
–
0.00
 % p.a.
Výše výnosu závisí na úrovni vašeho Investown členství.
Celková hodnota
3794000
 mil. Kč
Zajištěno hodnotou
45100000
 mil. Kč
LTV
0.7
 %
Splatnost
28
 měsíců
Účel
construction, business_development
Příloha

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

{"cs":{"description":"### Shrnutí\n\n🟢 **Aktuální stav výstavby:** Výstavba se nachází ve fázi přípravných zemních a stavebních prací. Na všech pozemcích byly dokončeny základové desky včetně rozvodů základní kanalizace, vodovodu a uzemnění pro bleskosvod.\n\nNa místě byla také složena ocelová konstrukce domů, jejíž instalace bude následovat.\n\nPříprava základů byla provedena pro všechny domy napříč pozemky, čímž je vytvořen pevný základ pro další fázi výstavby.\n\n**Cílem partnerů** je realizace developerského projektu v obci Hradištko, která se nachází mezi řekami Vltava a Sázava v okrese Praha-západ. V obci žije přes 2 400 obyvatel. Pozemky leží v jihovýchodní okrajové části obce Hradištko, místně nazvané Rajchardov. V sousedství je zástavba původních a novodobých samostatně stojících rodinných domů. Jedná se o nově vznikající, rozvíjející se městskou rezidenční čtvrť s četnou zelení v zahradách a na veřejném prostranství.\n\nV dochozí vzdálenosti od pozemků v rámci centra obce se nachází základní nabídka zboží a služeb (školka, škola, restaurace, potraviny, specializované obchody, drobné řemeslné dílny, sportoviště atd.). Kompletní občanská vybavenost je v rámci spádového centra Prahy s dojezdovou dobou cca 20 min.\n\nNa pozemcích se nenachází žádné stavby nebo vzrostlá zeleň a jsou připraveny na budoucí výstavbu. Soubor pozemků je napojen na inženýrské sítě dostupné v místě v rozsahu V, E, a retenční nádrž na pozemku. K hranici je přivedena zpevněná komunikace s veřejným osvětlením.\n\n### Způsoby zajištění\n\nÚvěr v celkové výši 3. tranše 3 794 000 Kč je zajištěn nemovitostí v hodnotě 45 100 000 Kč (LTV 70 %). V této etapě 3. tranše vybíráme 3 794 000 Kč \n\n1. **Zástavní právo na nemovitosti:** pozemky parc. č. 90/28, 90/34, 90/35, 90/33, 90/67. Zapsáno na LV 3673, 3714, 3713 v k. ú. Hradištko pod Medníkem\n2. **Zástavní právo k obchodnímu podílu:** Umdo development s.r.o., IČO: 19896808; AdayTema s.r.o., IČO: 09131558\n3. **Osobní ručení:** BAŞAR DOGA ŞEKER, datum narození 7. září 1981; ZIYA UMUT ALTINOK, datum narození 15. září 1981\n4. **Notářský zápis** s doložkou přímé vykonatelnosti\n\n### Financování projektu\n\nPo úspěšném profinancování projektu má partner 28 měsíců na splacení jistiny úvěru.\n\nInformace o tom, jaké má partner možnosti předčasného splacení úvěru, jsou uvedeny v části D, odrážce d) listu klíčových informací pro investory ([KIIS](https://drive.google.com/file/d/1RJCVLouahZJdiKDMDtNMksiwmE8kYSrq/view?usp=sharing)).\n\nInformace ohledně rizikového skóre projektu najdete v ([Scoring sheet](https://drive.google.com/file/d/1Af5xuRCsheTei-2kCVefid1k_xlyDtSw/view?usp=sharing)).\n","name":"Pozemky Hradištko – 3. tranše: 1. etapa"}}, {"en":{"description":"### Summary\n\n🟢 **Current status of construction:** Construction is currently in the preparatory earthworks and construction phase. Foundation slabs have been completed on all plots, including basic sewerage, water supply, and lightning rod grounding.\n\nThe steel structure of the houses has also been assembled on-site and will be installed shortly.\n\nThe foundations have been prepared for all houses across the plots, creating a solid foundation for the next phase of construction.\n\nThe partners aim to implement a development project in the village of Hradištko, located between the Vltava and Sázava rivers in the Prague-West district. The town has over 2,400 inhabitants. The land is located in the south-eastern outskirts of Hradištko, locally called Rajchardov. The neighborhood consists of old and modern detached houses. This newly established, developing urban residential area has numerous green areas in gardens and public spaces.\n\nThere is a basic range of goods and services (nursery, school, restaurant, grocery, specialty shops, small craft shops, sports facilities, etc.) within walking distance of the land within the village center. Full civic amenities are within the broader center of Prague, and the commute time is approximately 20 minutes.\n\nNo buildings or mature greenery are on the land, and it is ready for future development. The land set is connected to the on-site utilities in ranges V and E, and the parcel has a retention tank. A paved road with public lighting leads to the parcels.\n\nAfter the land purchase, the partners intend to obtain planning and building permits and to realize a development project of 5 semi-detached houses. \n\n### Security of payment\n\nThe loan in the total amount of the 3rd tranche of CZK 3,794,000 is secured by real estate worth CZK 45,100,000 (LTV 70%). In this stage of the 3rd tranche we are collecting CZK 3,794,000 \n\n### Security:\n\n1. **Lien on real estate:** land parc. no. 90/28, 90/34, 90/35, 90/33, 90/67. Registered on LV 3673, 3714, 3713 in the district of. Hradištko pod Medníkem\n2. **Lien on the business share:** Umdo development s.r.o., ID: 19896808; AdayTema s.r.o., ID No.: 09131558\n3. **Personal guarantee:** BAŞAR DOGA ŞEKER, born on 7 September 1981; ZIYA UMUT ALTINOK, born on 15 September 1981\n4. **Notarial deed** with direct enforceability clause\n\n### Project financing\n\nAfter successful project financing, the partner has 28 months to repay the loan's principal.\n\nThe partner plans to repay the loan from the sale of the property securing the loan or by refinancing from a bank loan.\n\nInformation on the partner's options for early repayment of the loan is provided in Part D, bullet point (d) of the Key Investor Information Sheet ([KIIS](https://drive.google.com/file/d/1RJCVLouahZJdiKDMDtNMksiwmE8kYSrq/view?usp=sharing)).\n\nInformation regarding the risk score of the project can be found in the ([Scoring sheet](https://drive.google.com/file/d/1Af5xuRCsheTei-2kCVefid1k_xlyDtSw/view?usp=sharing)).\n","name":"Pozemky Hradištko – 3rd tranche: 1st stage"}}

Časté dotazy

Výnosy se automaticky každý měsíc připisují do vaší Investown peněženky. Termín výplaty závisí na datu přepnutí projektu do stavu Vyplácení výnosů. Výnosy si můžete poslat na bankovní účet nebo reinvestovat.

Investiční příležitosti mají několik vrstev zajištění: zástavní právo na nemovitost (hodnota vždy min. o 20 % vyšší než úvěr, max. LTV 80 %), osobní ručení jednatele nebo vlastníků, notářský zápis s přímou vykonatelností (bez zdlouhavých soudů) a zástavní právo na 100 % obchodního podílu společnosti realizující projekt.

Všechny projekty procházejí důkladnou analýzou: ověřujeme bonitu partnera přes CRIBIS, insolvenční a exekuční rejstříky, cenový odhad a rozpočet stavby, finanční ukazatele společnosti a historii vlastníků. Na analýze spolupracuje risk analytik, odhadce, supervizor, obchodník, právník a key account manager. Sítem projde méně než 5 % projektů.

Po uvedení nového projektu na platformu lze investovat do jeho plného proinvestování. Investown průběžně řeší administrativu s vlastníkem projektu. Po proinvestování následuje fáze Zpracování investic (podpis zajišťovací dokumentace), poté Vyplácení výnosů. První výnos obdržíte 3–30 dní od přepnutí do této fáze.

Jakmile provedete investici, čeká se na dosažení cílové částky. Po uzavření investičního kola projekt vstupuje do fáze Zpracování investic (5–7 pracovních dnů). Poté se přechází do fáze Vyplácení výnosů, váš vklad se začíná úročit a po uplynutí jednoho měsíce obdržíte první výnos. Výnosy dostanete každý měsíc po dobu trvání investice (většinou 12–36 měsíců). Po skončení investičního období obdržíte investovaný vklad zpět do Investown peněženky.

Etapa je část projektu zajištěného jednou nemovitostí. Projekt může mít 1–5 etap, které neodpovídají postupnému časovému vývoji realizace. Po proinvestování cílové částky etapy ji Investown okamžitě zpracuje a do týdne přepne do stavu Vyplácení výnosů, bez čekání na ostatní etapy.

Investorům vzniká nárok na dodatečný výnos ze smluvní pokuty za každý den prodlení. U projektů s dokumentací do 17. 6. 2025 činí pokuta 0,2 % z dlužné částky denně. U projektů od 18. 6. 2025 je to 0,1 % denně po dobu prvních 30 dní, poté 0,05 % denně. Pokuta se dělí mezi všechny aktivní investory v daném projektu.

Nenašli jste, co jste hledali?
Všechny časté dotazy

Začněte investovat ještě dnes

Pozemky Hradištko – 3. tranše: 1. etapa
Pozemky Hradištko – 3rd tranche: 1st stage
Výnos
0.086
–
0.00
 % p.a.
Celková hodnota
3794000
 mil. Kč
Zajištěno hodnotou
45100000
 mil. Kč