Heading 1
Heading 2
Heading 3
Heading 4
Heading 5
Heading 6
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.
Block quote
Ordered list
- Item 1
- Item 2
- Item 3
Unordered list
Text link
Bold text
Emphasis
Superscript
Subscript
{"cs":{"description":"### Shrnutí\n\n🟢 **Aktuální stav výstavby dle supervize ze dne 6. 11. 2025:** Práce na stavbě pokračují dle plánu a jsou z první třetiny hotové. \n\n* **Pozemek č. 90/33:** Stavba je nadále ve stejné fázi. Dokončená je základová deska, základní rozvody kanalizace a vody a kovové konstrukce 1. nadzemního podlaží jsou osazené.\n\n* **Pozemek č. 90/67:** Budova má dokončenou základovou desku, základní rozvody kanalizace a vody a hotovou konstrukci 1. nadzemního podlaží. Nově přibyla kovová konstrukce 2. nadzemního podlaží a střechy.\n\n* **Pozemek č. 90/34:** I na této stavbě je dokončena základová deska, základní rozvody kanalizace a vody, kovová konstrukce 1. nadzemního podlaží a strop 1. nadzemního podlaží. Nově je hotová kovová konstrukce 2. nadzemního podlaží a střechy. Rovněž započalo oplášťování stavby, a to na úrovni 1. podlaží.\n\n* **Pozemek č. 90/28:** Budova se nachází ve fázi, kdy je hotová celá kovová konstrukce včetně střechy. Všechny stěny jsou již zaklopené. Střecha je osazena plechovou falcovou krytinou a částečně i klempířskými prvky.\n\n* **Pozemek č. 90/35:** Stavba se nachází v pokročilé fázi – kovová konstrukce je kompletně hotová, stěny jsou zaklopené, střešní konstrukce je zakryta plechovou falcovou krytinou a částečně osazena klempířskými prvky. Dům je již opatřen plastovými okny s trojskly, včetně oken francouzských. Započala instalace vnitřních elektrorozvodů, byly provedeny rozvody kanalizace. Stěny jsou částečně vyplněné izolací.\n\n**Cílem partnerů** je realizace developerského projektu v obci Hradištko, která se nachází mezi řekami Vltava a Sázava v okrese Praha-západ. V obci žije přes 2 400 obyvatel. Pozemky leží v jihovýchodní okrajové části obce Hradištko, místně nazvané Rajchardov. V sousedství je zástavba původních a novodobých samostatně stojících rodinných domů. Jedná se o nově vznikající, rozvíjející se městskou rezidenční čtvrť s četnou zelení v zahradách a na veřejném prostranství.\n\nV dochozí vzdálenosti od pozemků v rámci centra obce se nachází základní nabídka zboží a služeb (školka, škola, restaurace, potraviny, specializované obchody, drobné řemeslné dílny, sportoviště atd.). Kompletní občanská vybavenost je v rámci spádového centra Prahy s dojezdovou dobou cca 20 min.\n\nNa pozemcích se nenachází žádné stavby nebo vzrostlá zeleň a jsou připraveny na budoucí výstavbu. Soubor pozemků je napojen na inženýrské sítě dostupné v místě v rozsahu V, E a retenční nádrž na pozemku. K hranici je přivedena zpevněná komunikace s veřejným osvětlením.\n\n### Způsoby zajištění\n\nÚvěr v celkové výši 6. tranše 12 620 186 Kč je zajištěn nemovitostí v hodnotě 81 171 694 Kč (LTV 70 %). V této etapě 6. tranše vybíráme 4 000 000 Kč \n\n1. **Zástavní právo na nemovitosti:** pozemky parc. č. 90/28, 90/34, 90/35, 90/33, 90/67 v k. ú. Hradištko pod Medníkem\n2. **Zástavní právo k obchodnímu podílu:** Umdo development s.r.o., IČO: 198 96 808; AdayTema s.r.o., IČO: 091 31 558\n3. **Osobní ručení:** BAŞAR DOGA ŞEKER, datum narození 7. září 1981; ZIYA UMUT ALTINOK, datum narození 15. září 1981\n4. **Notářský zápis** s doložkou přímé vykonatelnosti\n\n### Financování projektu\n\nPo úspěšném profinancování projektu má partner 25 měsíců na splacení jistiny úvěru.\n\nInformace o tom, jaké má partner možnosti předčasného splacení úvěru, jsou uvedeny v části D, odrážce d) listu klíčových informací pro investory ([KIIS](https://drive.google.com/file/d/1MTDyghPNLC9IK4Hw1j3chzm3VRg_bp8i/view?usp=sharing)).\n\nInformace ohledně rizikového skóre projektu najdete v ([Scoring sheet](https://drive.google.com/file/d/1FPJqi-SROgwEh4L6beK2XkFk-luNU0rs/view?usp=sharing)).\n","name":"Pozemky Hradištko – 6. tranše: 2. etapa"}}, {"en":{"description":"### Summary\n\n🟢 **Current state of construction according to supervision on November 6, 2025:** Work on the construction site is proceeding according to plan and is one-third complete.\n\n* **Plot No. 90/33:** Construction remains at the same stage. The foundation slab has been completed, the basic sewer and water distribution systems have been installed, and the metal structures for the first floor have been erected.\n\n* **Plot No. 90/67:** The building has a completed foundation slab, basic sewer and water distribution systems, and the structure of the first floor is complete. The metal structure of the second floor and the roof have been newly added.\n\n* **Plot No. 90/34:** The foundation slab, basic sewer and water distribution systems, metal structure of the first floor, and ceiling of the first floor have also been completed on this building. The metal structure of the second floor and the roof have been newly completed. Cladding of the building has also begun on the first floor.\n\n* **Plot No. 90/28:** The building is at the stage where the entire metal structure, including the roof, has been completed. All walls have already been covered. The roof is fitted with sheet metal standing seam roofing and partially with plumbing elements.\n\n* **Plot No. 90/35:** The building is at an advanced stage – the metal structure is completely finished, the walls are covered, the roof structure is covered with sheet metal standing seam roofing and partially fitted with flashings. The house is already equipped with triple-glazed plastic windows, including French windows. The installation of internal electrical wiring has begun, and the sewerage system has been installed. The walls are partially filled with insulation.\n\n**The partners aim** to implement a development project in the village of Hradištko, located between the Vltava and Sázava rivers in the Prague-West district. The town has over 2,400 inhabitants. The land is located in the south-eastern outskirts of Hradištko, locally called Rajchardov. The neighborhood consists of old and modern detached houses. This newly established, developing urban residential area has numerous green areas in gardens and public spaces.\n\nThere is a basic range of goods and services (nursery, school, restaurant, grocery, specialty shops, small craft shops, sports facilities, etc.) within walking distance of the land within the village center. Full civic amenities are within the broader center of Prague, and the commute time is approximately 20 minutes.\n\nNo buildings or mature greenery are on the land, and it is ready for future development. The land set is connected to the on-site utilities in ranges V and E, and the parcel has a retention tank. A paved road with public lighting leads to the parcels.\n\n### Security of payment\n\nThe loan in the total amount of the 6th tranche of CZK 12,620,186 is secured by real estate worth CZK 81,171,694 (LTV 70%). In this stage of the 6th tranche we are collecting CZK 4,000,000 \n\n### Security:\n\n1. **Lien on real estate:** land parc. no. 90/28, 90/34, 90/35, 90/33, 90/67 in the district of. Hradištko pod Medníkem\n2. **Lien on the business share:** Umdo development s.r.o., ID: 198 96 808; AdayTema s.r.o., ID No.: 091 31 558\n3. **Personal guarantee:** BAŞAR DOGA ŞEKER, born on September 7, 1981; ZIYA UMUT ALTINOK, born on September 15, 1981\n4. **Notarial deed** with direct enforceability clause\n\n### Project financing\n\nAfter successful project financing, the partner has 25 months to repay the loan's principal.\n\nThe partner plans to repay the loan from the sale of the property securing the loan or by refinancing from a bank loan.\n\nInformation on the partner's options for early repayment of the loan is provided in Part D, bullet point (d) of the Key Investor Information Sheet ([KIIS](https://drive.google.com/file/d/1MTDyghPNLC9IK4Hw1j3chzm3VRg_bp8i/view?usp=sharing)).\n\nInformation regarding the risk score of the project can be found in the ([Scoring sheet](https://drive.google.com/file/d/1FPJqi-SROgwEh4L6beK2XkFk-luNU0rs/view?usp=sharing)).\n","name":"Pozemky Hradištko – 6th tranche: 2nd stage"}}