Profinancovaný projekt
Bankovní úroveň zajištění

Pozemky Tutleky U Rybníka 3: 1. etapa

Plots Tutleky U Rybníka 3: 1st stage

Výnos
0.078
0.00
 % p.a.
Výše výnosu závisí na úrovni vašeho Investown členství.
Celková hodnota
2779000
 mil. Kč
Zajištěno hodnotou
65130000
 mil. Kč
LTV
0.7
 %
Splatnost
15
 měsíců
Účel
developer_project, business_development
Příloha

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

{"cs":{"description":"### Jak projekt postupuje\n\n🟢 **Aktuální stav výstavby podle supervize ze dne 4. 6. 2026:** Výstavba pokračuje podle plánovaného harmonogramu. Do doby místního šetření významně pokročily rozsáhlé zemní práce, realizace podkladní vrstvy komunikací, drenážního systému a pokládka geotextilie.\n\nSoučasně byly realizovány klíčové inženýrské sítě, konkrétně vodovodní řady včetně zemních souprav a kanalizační systém s výjimkou čistírny odpadních vod. Připraveny jsou také chráničky pro budoucí přívody veřejného osvětlení, což umožní plynulé navázání dalších prací.\n\nV následujícím období se výstavba zaměří na dokončení zbývajících infrastrukturních rozvodů a technických instalací.\n\n### O projektu\n\n**Cílem projektu** je **výstavba technické a dopravní infrastruktury na souboru 27 pozemků** v obci Tutleky nedaleko Rychnova nad Kněžnou. Na již rozestavěných pozemcích bude realizována výstavba komunikací, inženýrských sítí a veřejného osvětlení.\n\nVlastník projektu současně podniká kroky, které povedou ke změně stavebního povolení. Úprava změní dispozice výstavby tak, aby mohly být parcely připraveny pro realizaci až 25 rodinných domů s možností dvou bytových jednotek v každém objektu. \n\nČást finančních prostředků z **první tranše** bude použita na **refinancování** stávajícího závazku vůči původnímu věřiteli. Následně bude hrazena **výstavba** a **rozvoj podnikání**, tedy pokrytí finančních závazků souvisejících s poskytnutým úvěrem. \n\n### O nemovitosti v zástavě\n\n**Nemovitostí v zástavě je soubor 27 pozemků** v katastrálním území Tutleky v okrese Rychnov nad Kněžnou. Celková započitatelná plocha činí cca 34 120 m² a nachází se v rozvojovém území určeném územním plánem k rodinnému bydlení.\n\nV současné době jsou pozemky geometricky vymezeny a byly provedeny přípravné práce pro stavbu komunikací a instalaci inženýrských sítí, konkrétně vody a kanalizace. K pozemkům již byla vydána řada územních rozhodnutí pro vodovod, kanalizaci, komunikace a veřejné osvětlení.\n\n### O lokalitě\n\n**Obec Tutleky** se nachází ve východních Čechách v bezprostřední blízkosti Kostelce nad Orlicí a Rychnova nad Kněžnou. Díky této poloze nabízí ideální kombinaci klidného venkovského prostředí a rychlé dostupnosti městské infrastruktury, služeb i pracovních příležitostí. Lokalita je dobře napojena na regionální silniční síť a zároveň si zachovává komorní charakter menší obce, což je stále vyhledávanější kvalita na trhu s bydlením.\n\nTutleky, které leží v **podhůří Orlických hor**, navíc nabízejí dechberoucí výhledy do okolí. Jsou zde patrné typické podorlické krajinné prvky – mírné zvlnění terénu, rozlehlá pole a lesy, potoky a říčky, a to vše v bezprostřední blízkosti zástavby. V dosahu jsou turistické trasy a cyklostezky, historické památky jako např. zámky v Kostelci nad Orlicí či Doudlebách a široké spektrum kulturního a společenského života.\n\n### Způsoby zajištění\n\nÚvěr v celkové výši 3. tranše 2 779 000 Kč je zajištěn nemovitostí v hodnotě 65 130 000 Kč (LTV 70 %). V této etapě 3. tranše vybíráme 2 779 000 Kč \n\n### Zajištění\n\n1. **Zástavní právo na nemovitosti:** Pozemky parc. č. 3402/28, 3402/29, 3402/30, 3402/31, 3402/32, 3402/33, 3402/34, 3402/35, 3402/36, 3402/37, 3402/38, 3402/39, 3402/40, 3402/41, 3402/42, 3402/43, 3402/44, 3402/45, 3402/46, 3402/47, 3402/48, 3402/49, 3402/50, 3402/51, 3402/52, 3402/53 a 3402/54, vše včetně příslušenství v k. ú. Tutleky\n2. **Zástavní právo k obchodnímu podílu:** SOLNER CZ s.r.o., IČO: 020 04 909\n3. **Osobní ručení:** VÁCLAV FUŤKO, datum narození 15. prosince 1979\n4. **Notářský zápis** s doložkou přímé vykonatelnosti.\n\n### Financování projektu\n\nPo úspěšném profinancování projektu má vlastník projektu 15 měsíců na splacení jistiny úvěru.\n\nInformace o tom, jaké má vlastník projektu možnosti předčasného splacení úvěru, jsou uvedeny v části D, odrážce d) listu klíčových informací pro investory ([KIIS](https://drive.google.com/file/d/1vzWxPTBx3wkcGzNVrfyHXrxHAUxRUxQS/view?usp=sharing)).\n\nInformace ohledně rizikového skóre projektu najdete v ([Scoring sheet](https://drive.google.com/file/d/1RiULlfkv9ySecu0lZ5MClMR0M2nSYUVH/view?usp=sharing)).\n","name":"Pozemky Tutleky U Rybníka 3: 1. etapa"}}, {"en":{"description":"### Progressing of the project\n\n🟢 **Current state of construction according to supervision on June 4, 2026:** Construction is proceeding according to schedule. By the time of the site inspection, significant progress had been made on extensive earthwork, the installation of the road base layer, the drainage system, and the laying of geotextile.\n\nAt the same time, key utility networks were installed, specifically water mains—including underground assemblies—and the sewer system, with the exception of the wastewater treatment plant. Conduit conduits for future public lighting lines are also in place, which will allow for a smooth transition to the next phase of work.\n\nIn the coming period, construction will focus on completing the remaining infrastructure networks and technical installations.\n\n### About the project\n\n**The aim of the project** is to **build technical and transport infrastructure on a set of 27 plots** in the village of Tutleky near Rychnov nad Kněžnou. Roads, utilities, and public lighting will be built on the plots, which are already under construction.\n\nThe project owner is also taking steps to change the building permit. The amendment will change the layout of the construction so that the plots can be prepared for the construction of up to 25 family houses with the possibility of two residential units in each building. \n\nPart of the funds from the **first tranche** will be used to **refinance** the existing liability to the original creditor. Subsequently, **construction** and **business development** will be financed, i.e., the financial obligations related to the loan provided will be covered. \n\n### Lien real estate\n\n**The mortgaged property consists of a set of 27 plots** in the cadastral area of Tutleky in the district of Rychnov nad Kněžnou. The total eligible area is approximately 34,120 m² and is located in a development area designated by the zoning plan for family housing.\n\nThe plots are currently geometrically defined and preparatory work has been carried out for the construction of roads and the installation of utilities, specifically water and sewerage. A number of zoning decisions have already been issued for the plots for water supply, sewerage, roads, and public lighting.\n\n### About the location\n\n**The village of Tutleky** is located in eastern Bohemia, in close proximity to Kostelec nad Orlicí and Rychnov nad Kněžnou. Thanks to its location, it offers an ideal combination of a peaceful rural environment and quick access to urban infrastructure, services, and job opportunities. The location is well connected to the regional road network while retaining the intimate character of a smaller village, which is an increasingly sought-after quality in the housing market.\n\nTutleky, located **in the foothills of the Orlické Mountains**, also offers breathtaking views of the surrounding area. Typical features of the Podorlicko landscape are evident here – gently rolling terrain, vast fields and forests, streams and rivers, all in the immediate vicinity of the development. Within easy reach are hiking and cycling trails, historical monuments such as the castles in Kostelec nad Orlicí and Doudleby, and a wide range of cultural and social life.\n\n### Security of payment\n\nThe loan in the total amount of the 3rd tranche of CZK 2,779,000 is secured by real estate worth CZK 65,130,000 (LTV 70%). In this stage of the 3rd tranche we are collecting CZK 2,779,000 \n\n### Security:\n\n1. **Lien on real estate:** Land parcels numbers 3402/28, 3402/29, 3402/30, 3402/31, 3402/32, 3402/33, 3402/34, 3402/35, 3402/36, 3402/37, 3402/38, 3402/39, 3402/40, 3402/41, 3402/42, 3402/43, 3402/44, 3402/45, 3402/46, 3402/47, 3402/48, 3402/49, 3402/50, 3402/51, 3402/52, 3402/53 and 3402/54, everything including accessories in the cadastral area of Tutleky\n2. **Lien to the business share:** SOLNER CZ s.r.o., ID: 020 04 909\n3. **Personal guarantee:** VÁCLAV FUŤKO, born on December 15, 1979\n4. **Notarial deed** with a clause of direct enforceability.\n\n### Project financing\n\nAfter successful project financing, the project owner has 15 months to repay the loan's principal.\n\nThe project owner plans to repay the loan from the sale of the property securing the loan or by refinancing from a bank loan.\n\nInformation on the project owner's options for early repayment of the loan is provided in Part D, bullet point (d) of the Key Investor Information Sheet ([KIIS](https://drive.google.com/file/d/1vzWxPTBx3wkcGzNVrfyHXrxHAUxRUxQS/view?usp=sharing)).\n\nInformation regarding the risk score of the project can be found in the ([Scoring sheet](https://drive.google.com/file/d/1RiULlfkv9ySecu0lZ5MClMR0M2nSYUVH/view?usp=sharing)).\n","name":"Plots Tutleky U Rybníka 3: 1st stage"}}

Časté dotazy

Výnosy se automaticky každý měsíc připisují do vaší Investown peněženky. Termín výplaty závisí na datu přepnutí projektu do stavu Vyplácení výnosů. Výnosy si můžete poslat na bankovní účet nebo reinvestovat.

Investiční příležitosti mají několik vrstev zajištění: zástavní právo na nemovitost (hodnota vždy min. o 20 % vyšší než úvěr, max. LTV 80 %), osobní ručení jednatele nebo vlastníků, notářský zápis s přímou vykonatelností (bez zdlouhavých soudů) a zástavní právo na 100 % obchodního podílu společnosti realizující projekt.

Všechny projekty procházejí důkladnou analýzou: ověřujeme bonitu partnera přes CRIBIS, insolvenční a exekuční rejstříky, cenový odhad a rozpočet stavby, finanční ukazatele společnosti a historii vlastníků. Na analýze spolupracuje risk analytik, odhadce, supervizor, obchodník, právník a key account manager. Sítem projde méně než 5 % projektů.

Po uvedení nového projektu na platformu lze investovat do jeho plného proinvestování. Investown průběžně řeší administrativu s vlastníkem projektu. Po proinvestování následuje fáze Zpracování investic (podpis zajišťovací dokumentace), poté Vyplácení výnosů. První výnos obdržíte 3–30 dní od přepnutí do této fáze.

Jakmile provedete investici, čeká se na dosažení cílové částky. Po uzavření investičního kola projekt vstupuje do fáze Zpracování investic (5–7 pracovních dnů). Poté se přechází do fáze Vyplácení výnosů, váš vklad se začíná úročit a po uplynutí jednoho měsíce obdržíte první výnos. Výnosy dostanete každý měsíc po dobu trvání investice (většinou 12–36 měsíců). Po skončení investičního období obdržíte investovaný vklad zpět do Investown peněženky.

Etapa je část projektu zajištěného jednou nemovitostí. Projekt může mít 1–5 etap, které neodpovídají postupnému časovému vývoji realizace. Po proinvestování cílové částky etapy ji Investown okamžitě zpracuje a do týdne přepne do stavu Vyplácení výnosů, bez čekání na ostatní etapy.

Investorům vzniká nárok na dodatečný výnos ze smluvní pokuty za každý den prodlení. U projektů s dokumentací do 17. 6. 2025 činí pokuta 0,2 % z dlužné částky denně. U projektů od 18. 6. 2025 je to 0,1 % denně po dobu prvních 30 dní, poté 0,05 % denně. Pokuta se dělí mezi všechny aktivní investory v daném projektu.

Nenašli jste, co jste hledali?
Všechny časté dotazy

Začněte investovat ještě dnes

Pozemky Tutleky U Rybníka 3: 1. etapa
Plots Tutleky U Rybníka 3: 1st stage
Výnos
0.078
0.00
 % p.a.
Celková hodnota
2779000
 mil. Kč
Zajištěno hodnotou
65130000
 mil. Kč