Terasy Březová alej - 5. tranše: 1. etapa

Terasy Březová alej – 5th tranche: 1st stage

Výnos
0.084
–
0.00
 % p.a.
Výše výnosu závisí na úrovni vašeho Investown členství.
Celková hodnota
3600000
 mil. Kč
Zajištěno hodnotou
55200000
 mil. Kč
LTV
0.6488
 %
Splatnost
8
 měsíců
Účel
construction, business_development
Příloha

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

{"cs":{"description":"### Shrnutí\n\n🟢 **Aktuální stav výstavby:** Dokončeny jsou základy včetně zemních prací a svislé konstrukce, stejně jako stropy a krov. Střešní krytina z hliníkového plechu je téměř kompletní. Postupují také klempířské konstrukce, které jsou hotové zčásti.\n\nV interiéru probíhá dokončování povrchových úprav – omítky jsou provedeny přibližně z poloviny. Osazena jsou všechna plastová okna s trojsklem. Instalace dveří je provedena zčásti, stejně tak rozvody vytápění, elektroinstalace, vnitřního vodovodu a kanalizace. Vnitřní hygienické vybavení je částečně osazeno, schodiště a výtahy jsou již z velké části hotové.\n\nNa exteriéru je zhruba z poloviny dokončen kontaktní zateplovací systém s povrchovou úpravou. \n\nOstatní práce postupují podle harmonogramu a stavba směřuje do fáze rozsáhlých dokončovacích a instalačních činností.\n\n**Cílem partnera** je přestavba stávající nemovitosti z roku 1925 na 2 bytové domy s 8 bytovými jednotkami, komerčním prostorem, 4 garážovými stáními a sklepy.\n\nV budově A budou byty o dispozicích 2+1, 3+kk a 4+kk, kavárna v 1. nadzemním podlaží a sklepy v podzemním podlaží. V budově B budou bytové jednotky o dispozicích 3+1 a 2+1. Obě budovy budou mít 3 nadzemní podlaží a jedno podzemní podlaží.\n\n### Způsoby zajištění\n\nÚvěr v celkové výši 5. tranše 14 059 172 Kč je zajištěn nemovitostí v hodnotě 55 200 000 Kč (LTV 65 %). V této etapě 5. tranše vybíráme 3 600 000 Kč \n\n1. **Zástavní právo na nemovitosti:** V současném stavu rozestavěná stavba, v budoucím stavu bytové a nebytové jednotky: Pozemky parc.č. 622 včetně stavby č.p. 192 a příslušenství (a včetně v budoucnu postavených bytových a nebytových jednotek). Zapsáno na LV: 987 v k.ú. Starý Harcov obec Liberec, okres Liberec\n2. **Zástavní právo k obchodnímu podílu:** ALTO Group s.r.o., IČO: 09989170\n3. **Ručení:** ALMA ELEKTRO s.r.o. IČO: 25420151\n4. **Notářský zápis** s doložkou přímé vykonatelnosti.\n\n### Financování projektu\n\nPo úspěšném profinancování projektu má partner 8 měsíců na splacení jistiny úvěru.\n\nInformace o tom, jaké má partner možnosti předčasného splacení úvěru, jsou uvedeny v části D, odrážce d) listu klíčových informací pro investory ([KIIS](https://drive.google.com/file/d/1gcxYn_AEkJ9AxJ_Gih6PYFTHUICC5UVE/view?usp=sharing)).\n\nInformace ohledně rizikového skóre projektu najdete v ([Scoring sheet](https://drive.google.com/file/d/1uOxbJvq0btNHkqD4R4tP7l0mFsusN2CD/view?usp=sharing)).\n","name":"Terasy Březová alej - 5. tranše: 1. etapa"}}, {"en":{"description":"### Summary\n\n🟢 **Current state of construction:** The foundations, including earthworks and vertical structures, as well as ceilings and roof trusses, have been completed. The aluminum sheet roofing is almost complete. The metalwork is also progressing and is partially finished.\n\nThe interior surface finishes are being completed – approximately half of the plastering has been done. All plastic triple-glazed windows have been installed. The installation of doors is partially complete, as are the heating, electrical, internal water supply, and sewage systems. The interior sanitary facilities are partially installed, and the staircases and elevators are largely complete.\n\nOn the exterior, approximately half of the contact insulation system with surface finish has been completed. \n\nOther work is progressing according to schedule, and the construction is moving into the phase of extensive finishing and installation activities.\n\nThe partner's goal is to redevelop an existing property built in 1925 into 2 apartment buildings with eight residential units, commercial space, four garage spaces, and basements.\n\nBuilding A will include 2+1, 3+kk, and 4+kk apartments, a café on the 1st floor, and basements on the basement level. Building B will have 3+1 and 2+1 flats. Both buildings will have three floors above ground and one underground floor.\n\n### Security of payment\n\nThe loan in the total amount of the 5th tranche of CZK 14,059,172 is secured by real estate worth CZK 55,200,000 (LTV 65%). In this stage of the 5th tranche we are collecting CZK 3,600,000 \n\n### Security:\n\n1. **Lien on real estate:** In the current state, the building is under construction; in the future state, residential and non-residential units: land parcel no. 622, including building no. p. 192 and accessories (including residential and non-residential units built in the future). Registered on LV 987 in the cad. Starý Harcov municipality Liberec, district Liberec\n2. **Lien on the business share:** ALTO Group s.r.o., ID: 09989170\n3. **Guarantee:** ALMA ELEKTRO s.r.o., ID: 25420151\n4. **Notarial deed** with a clause of direct enforceability.\n\n### Project financing\n\nAfter successful project financing, the partner has 8 months to repay the loan's principal.\n\nThe partner plans to repay the loan from the sale of the property securing the loan or by refinancing from a bank loan.\n\nInformation on the partner's options for early repayment of the loan is provided in Part D, bullet point (d) of the Key Investor Information Sheet ([KIIS](https://drive.google.com/file/d/1gcxYn_AEkJ9AxJ_Gih6PYFTHUICC5UVE/view?usp=sharing)).\n\nInformation regarding the risk score of the project can be found in the ([Scoring sheet](https://drive.google.com/file/d/1uOxbJvq0btNHkqD4R4tP7l0mFsusN2CD/view?usp=sharing)).\n","name":" Terasy Březová alej – 5th tranche: 1st stage"}}

Časté dotazy

Výnosy se automaticky každý měsíc připisují do vaší Investown peněženky. Termín výplaty závisí na datu přepnutí projektu do stavu Vyplácení výnosů. Výnosy si můžete poslat na bankovní účet nebo reinvestovat.

Investiční příležitosti mají několik vrstev zajištění: zástavní právo na nemovitost (hodnota vždy min. o 20 % vyšší než úvěr, max. LTV 80 %), osobní ručení jednatele nebo vlastníků, notářský zápis s přímou vykonatelností (bez zdlouhavých soudů) a zástavní právo na 100 % obchodního podílu společnosti realizující projekt.

Všechny projekty procházejí důkladnou analýzou: ověřujeme bonitu partnera přes CRIBIS, insolvenční a exekuční rejstříky, cenový odhad a rozpočet stavby, finanční ukazatele společnosti a historii vlastníků. Na analýze spolupracuje risk analytik, odhadce, supervizor, obchodník, právník a key account manager. Sítem projde méně než 5 % projektů.

Po uvedení nového projektu na platformu lze investovat do jeho plného proinvestování. Investown průběžně řeší administrativu s vlastníkem projektu. Po proinvestování následuje fáze Zpracování investic (podpis zajišťovací dokumentace), poté Vyplácení výnosů. První výnos obdržíte 3–30 dní od přepnutí do této fáze.

Jakmile provedete investici, čeká se na dosažení cílové částky. Po uzavření investičního kola projekt vstupuje do fáze Zpracování investic (5–7 pracovních dnů). Poté se přechází do fáze Vyplácení výnosů, váš vklad se začíná úročit a po uplynutí jednoho měsíce obdržíte první výnos. Výnosy dostanete každý měsíc po dobu trvání investice (většinou 12–36 měsíců). Po skončení investičního období obdržíte investovaný vklad zpět do Investown peněženky.

Etapa je část projektu zajištěného jednou nemovitostí. Projekt může mít 1–5 etap, které neodpovídají postupnému časovému vývoji realizace. Po proinvestování cílové částky etapy ji Investown okamžitě zpracuje a do týdne přepne do stavu Vyplácení výnosů, bez čekání na ostatní etapy.

Investorům vzniká nárok na dodatečný výnos ze smluvní pokuty za každý den prodlení. U projektů s dokumentací do 17. 6. 2025 činí pokuta 0,2 % z dlužné částky denně. U projektů od 18. 6. 2025 je to 0,1 % denně po dobu prvních 30 dní, poté 0,05 % denně. Pokuta se dělí mezi všechny aktivní investory v daném projektu.

Nenašli jste, co jste hledali?
Všechny časté dotazy

Začněte investovat ještě dnes

Terasy Březová alej - 5. tranše: 1. etapa
Terasy Březová alej – 5th tranche: 1st stage
Výnos
0.084
–
0.00
 % p.a.
Celková hodnota
3600000
 mil. Kč
Zajištěno hodnotou
55200000
 mil. Kč